Description

The aim of this work package is to guarantee the correct interface between the laboratory tests and the manufacturing plant. In order to ensure the correct up-scaling of the green asphalt pavements production and its integration in the asphalt production plant the following objectives should be achieved:

  • To design the manufacturing process for the pilot plant (pilot plant lay out).
  • To scale up the production of the green binder and the bio-based fluxing agents to an industrial level.
  • To design modifications into the standardised process for the preparation of asphalt mixtures.
  • To develop a process quality and risk assessment plan.

Progress

30 %